Yuzefo-Mykolaiv Biogas Complex


Client: Yuzefo-Mykolaiv Sugar Factory

Country Ukraine

Power: 10 MW/h

Operation: 2019-2022

 

 

Phase 1/2019: Anaerobic digestion technology Adverio

  • Feedstock: sugar production waste
  • End product – industrial heat , electricity, solid fertilizer.
  • Production capacity: 2500 m³ of biogas/day, 3200MW/h, 200 tons per day
  • Configuration: 1 × 8,000 m³ + 1 × 4,000 m³.
  • Loading: 24 hours/335 days per year.

Phase 2/2022: Anaerobic digestion technology Adverio+biometane technology Aerco

  • Feedstock: sugar production waste and prepared straw
  • End product – industrial heat , electricity, biometane, solid fertilizer.
  • Production capacity: 2500 m³ of biogas/day, 10000MW/h, 200 tons per day
  • Biogas purification to biomethane using amine adsorption technology
  • Configuration: 2 × 8,000 m³ + 1 × 4,000 m³+ 1× 6000+ 2 bioscrubbers +1ammonia plant
  • Loading: 24 hours/335 days per year.

     

 

 

Projects

  • Design and Engineering
  • Construction
  • Equipment manufacture and Installation
  • Automation and Commissioning
  • Staff support

Processes Involved

  • Receipt of Raw Materials
  • Preparation of Raw Materials
  • Fermentation
  • Fermentation
  • Decantation and Purification of the Decantate
  • Biogas Purification
  • Cogeneration
  • Biogas amination
  • Disposal of Surplus Materials