Engineering. Design.
Design work for enterprises, individual workshops, and industrial and utility facilities is carried out using a CAD system, which makes it possible to:
- Perform 3D modeling of objects
- Determine the effect of individual input parameters on the system as a whole
- Anticipate operational situations under various scenarios and their impact on the manufacturing process
Construction
For over 23 years, UTC has been constructing industrial facilities in the agro-industrial, food, microbiological, metallurgical, and other sectors, and has an extensive portfolio of construction projects in Ukraine, the CIS countries, and Europe.
- innovative biotechnologies
- modern, high-tech equipment
- Turnkey Construction (EPC)
Research Projects
UTC, together with Aqwise, Opure, Adverio, and other partners, is actively involved in developing new and innovative solutions in the following areas:
- biological wastewater treatment
- biofuel and ethanol production
Equipment Manufacturing
UTC carries out the full production cycle for equipment—from drafting technical specifications and design to the manufacture of finished products. The finished equipment is delivered to the customer for installation and commissioning.
work experience of more than
years
Equipment was manufactured for
objects
Automation
UTC uses innovative products and services in conjunction with smart technologies for monitoring, control, communication, and self-healing.
A comprehensive approach is used to address automation:
- analysis of the automation object
- selection of equipment
- preparation of project documentation
- support
Installation
The installation of process equipment is the most critical stage in the construction of complex industrial facilities and requires a high level of professionalism and expertise from the relevant personnel
UTC provides a full range of equipment installation services directly at the site of operation, including:
- Complete assembly of equipment
- Installation in the operating position as specified in the design
- Preparing equipment for commissioning
- commissioning
Commissioning and Adjustment Work
The purpose of commissioning is to ensure a trouble-free and safe startup of the system, as well as to configure and test the equipment in order to meet the parameters and operating conditions specified by the technology used to produce the final product.
Main Types of Commissioning Work Performed by UTC
- Connecting and configuring equipment
- Verification of the proper and correct operation of the equipment and all components
- Identification of potential violations and deficiencies prior to commissioning
- equipment warranty
Staff Training
The operation of industrial power facilities requires in-depth knowledge of the field, a clear understanding of the tasks at hand, and logical and rational decision-making regarding changes to production processes